-
Location Gaziantep, Turkey
-
Email Address info@rasafamuhendislik.com
-
Phone No +90 (537) 615 41 90
Rasafa Muhendislik
The work includes the provision and installation of the operating system of the drinking water station for Kafr Lusin camp with a capacity of 30 m3 per hour, composed of 240 solar panels with a capacity of 450 watts, and the German built-in control and operation equipment from Lawrence Solar Energy Equipment, where water is pumped to a high tank at a distance of 900 meters.
The infrastructure of the project is being prepared under the supervision of engineers specialized in the fields of solar energy and a number of technicians and workers. The project organization also makes periodic supervisory visits to monitor work progress and check quality.
latest project